Preliminary · Not for release
The work is still converging.
Case studies, CFD and wind-tunnel data are mid-iteration: being checked, cleaned up and drawn properly before they go on the wall. The residuals are dropping. The launch date is still inside the error bars.
- Case studies
- Drafting
- CFD + test data
- Post-processing
- Drawings
- Pending sign-off
- Launch
- TBD ± a few weeks
Can’t wait for convergence? Ask me about the work directly.